Port Area Redevelopment
Port Infrastructure

Port Area Redevelopment

Ischia2023
All projects
Area
Duration
Client
SOA category
OG7 — Maritime works and dredging

The challenge

Building and upgrading minimum services for the fishing sector on an in-service port infrastructure, in compliance with the technical and environmental requirements of the EU FEAMP funding.

The solution

Execution of the works as the first functional stage of a broader plan, with operations scheduled to ensure continuity of fishing and landing activities during construction.

Site phases

  1. 01

    Survey and detailed design

    Analysis of the port area and definition of the phased intervention.

  2. 02

    Site setup

    Organisation of the works to ensure continuity of port operations.

  3. 03

    Redevelopment works

    Interventions on the structures and spaces of the port area.

  4. 04

    Finishing and final arrangements

    Completion of the spaces and decorative elements.

  5. 05

    Testing and handover

    Final checks and return of the area to full operation.